All shops are open. We are shipping as usual please check the opening times using the Google Business Pages.

Prologic Last Meter Heavy Duty Long Leadclip with Pins & Tailrubber 10pcs

In stock
Only 2 left
SKU
SVE49889
£4.00

Designed to release the lead should it become snagged

For use with size 8 swivel

The metal arm reduces twist, releases easier and is stronger for bigger leads


A safe lead clip system for use with extremely heavy leads ideal for big river fishing.

More Information
Pack Size 10
Brand Prologic
Manufacturer Part Number 49889
Manufacturer Svendsen Sport
Barcode Number 5706301498892
Write Your Own Review
You're reviewing:Prologic Last Meter Heavy Duty Long Leadclip with Pins & Tailrubber 10pcs